12F424 - 3Ø Overhead Primary Metering
Revision 11
Aug 27, 2020
Note: This standard has been updated with a fiberglass crossarm but the drawing has yet to be updated.
Notes:
- Install connections to common neutral from ground wire, transformer rack, primary and secondary neutrals.
- Important! Contact Metering Dept. for cost estimates on material and labor for installing primary metering equipment.
Compatible Unit | Description | Quantity |
---|---|---|
C0540 | Wire OH Insulated #4 Soft Drawn Copper Solid | 70 |
D0108 | 15kV 3Ø Overhead Primary Metering Assembly | 1 |
E0202 | Cutout, 100A 15kV Polymer | 3 |
I0103 | Insulator, Spool w/ Rack #2 | 1 |
I0322 | Insulator, 15kV Polymer Suspension | 6 |
N0104 | Ground Rod with Ground Plate | 1 |
R0102 | Crossarm Mount w/ 3/8" x 6" Carriage Bolts (For Standard 7', 10', 11' & 13' Crossarms) | 3 |
R0302 | Capacitor Bank and Control & Protective Equipment Racks | 1 |
R0704 | Bolt, DA 5/8" x 24" | 1 |
R0734 | Washer, Galv Double Coil Spring Lock 5/8” | 2 |
R0741 | Washer, Galv Sq 2" Flat 11/16" Hole | 4 |
T0303 | Clamp, Straight Line 3/0-477 AAC & ACSR | 6 |
X0301D | Crossarm, 10' Double Tangent Fiberglass | 1 |
Z060+ | Connector, H-Type Al Compression | 1 |
Z0640 | Connector, Wedge | 6 |