115P302 115kV Triangular Post Polymer (Small Angles)

Revision 11
Jun 16, 2015

Notes:

  1. Pole setting depth: 10% of pole length plus 2 ft, per T&D Guideline 4-5-15.0.
  2. Quantity of T0955 is for 4-hole compression terminal connectors. Reduce this quantity to 4 for 2-hole compression terminal connections.
  3. Align top bracket vertically before drilling two 13/16" thru holes.
  4. for back-to-back insulator mounting detail see Compatible Unit I0706.
  5. for bonding detail see Compatible Unit N0252.1

Material List

Compatible Unit Description Quantity
H010* Rod, Armor Preformed 2
I0701 Insulator, Polymer Suspension 115kV 2
I0703 Insulator, Vertical Post 115kV Polymer w/ o Bracket 1
I0706 Insulator, Horizontal Post 115kV Polymer 1
MS2302 Rock, Crushed 5/8" Minus, 5/8" and 3/4" 1 Cu Yd
N0252 Overhead Bonding without Bonding Lugs 1
R100* Clamp, Line Post 3
R107* Clevis, Long Socket 2
R1309 2 Back-to-Back (3/4" x 18" Machine Bolts) 1
R1401 Bracket, Pole Top 1
T060* Deadend, Comp Sgl Tongue 2
T070* Terminal, Comp 2
T0955 Terminal Lug Bolt 8