12U321 Typical 7.2 12.47kV 3Ø Primary Metering Underground Terminal Pole (2 or 1-2 Al 15kV Cables)

Revision 16
Aug 27, 2020

Note: This standard has been updated with a fiberglass crossarm but the drawing has yet to be updated.

Notes:

  1. Important! Contact Metering Department for cost estimates on material and labor for installing primary metering equipment.
  2. See T&D Guideline 4-17-20.0 for schematic drawing of CT/PT and arrester connections.
  3. The concentric neutral from each cable shall be individually connected to the system neutral with a mini-wedge.
 
Compatible Unit Description Qty
E0202 Cutout, With 100A Fuseholder 3
F0213 Riser, 4" PVC w/ 90° Fiberglass Bend - 3Ø #2 & 1/0 Primary 1
K0201 Arrester, Overhead, MOV, 10kV Duty-Cycle / 8.4kV MCOV 3
N0104 Ground Rod with Ground Plate 1
R0102 Bracket, Cutout Crossarm Mount w/ 3/8" x 6" Carriage Bolts (For Standard 7', 10', 11' & 13' Crossarms) 3
R0206 Bracket, Cable Term Crossarm-Mount (#1 Pothead Bracket) 3
T101# Cable Termination Kit for Riser Poles 3
X0301 Crossarm, 10' Single Tangent Fiberglass 1
Z010* Clamp, Hotline 3
Z060+ Connector, H-Type Al Compression 4
Z0701 Connector, C-Crimp Cu #4 - #4 4.