115P301 (Maintenance Only) 115kV Triangular Post Tangent
Revision 4
Jun 25, 2015
- Pole setting depth: 10% of pole length plus 2 ft.
- Align top bracket vertically before drilling two 13/16" thru holes.
- For back-to-back insulator mounting detail see Compatible Unit I0706.
- For bonding details see Compatible Unit N0252.
Compatible Unit | Description | Quantity |
---|---|---|
I0703 | Insulator, Vertical Post 115kV Polymer w/ o Bracket | 1 |
I0706 | Insulator, Horizontal Post 115kV Polymer | 1 |
MS2302 | Rock, Crushed 5/8" Minus, 5/8" and 3/4" | 1 Cu Yd |
N0252 | Overhead Bonding without Bonding Lugs | 1 |
R100* | Clamp, Line Post | 3 |
R1115 | Split-Bolt, Pole Top | 1 |
R1401 | Bracket, Pole Top 115kV | 1 |