115P301 (Maintenance Only) 115kV Triangular Post Tangent

Revision 4
Jun 25, 2015

 

Notes:

  1. Pole setting depth: 10% of pole length plus 2 ft.
  2. Align top bracket vertically before drilling two 13/16" thru holes.
  3. For back-to-back insulator mounting detail see Compatible Unit I0706.
  4. For bonding details see Compatible Unit N0252.

Material List

Compatible Unit Description Quantity
I0703 Insulator, Vertical Post 115kV Polymer w/ o Bracket 1
I0706 Insulator, Horizontal Post 115kV Polymer 1
MS2302 Rock, Crushed 5/8" Minus, 5/8" and 3/4" 1 Cu Yd
N0252 Overhead Bonding without Bonding Lugs 1
R100* Clamp, Line Post 3
R1115 Split-Bolt, Pole Top 1
R1401 Bracket, Pole Top 115kV 1