12F330 Obsolete - 336.4 AAC 4-over-2 Double Circuit Tangent

Revision 5
Dec 1, 2017

Notes:

  1. 50' minimum pole height.
  2. Engineer must specify the size & number of down guys and anchors depending on conductor design tension, line angle, available down guy lead and span length. Refer to T&D Guideline 4-6 and Compatible Unit Sections A and G.
  3. Crossarms to be set to split the angle in the line. Guy should be set in the plane of the crossarm if possible.
  4. This assembly is intended for primary conductors with a maximum working tension of 2,500 lb/Ø or less. For deadending conductors with a maximum working tension between 2,500 lb/Ø and 4,000 lb/Ø refer to Assembly Unit 12F390.
  5. New overhead double circuit construction is allowed in rural areas only. Refer to T&D Guideline 4-23-7.0 — Design Practices for Constructing Double Circuit Lines

Material List

Compatible Unit Description Quantity
I0103 Insulator, 600V #2 Single Point Secondary Rack 1
I0380 Insulator, 15kV Sgl Polymer Vise-Top Insulator - 3-3/4" x 4-3/4" Wood Crossarm Mount 4
I0381 Insulator, 15kV Sgl Polymer Vise-Top Insulator - 3-3/4" x 5-3/4" Wood Crossarm Mount 2
R1113 Split-Bolt Assembly, 5/8" x 6" Machine Bolts 2
X0101 Crossarm, 7' Single 2-Steel Pin Crossarm 1
X0401 Crossarm, 10' Single 4-Steel Pin Crossarm 1