12U323 Typical Dead-Front 200A 7.2 12.47kV 3Ø Underground Primary Metering Installation

Revision 4
Dec 23, 2016

Compatible Unit Description Qty
D0110 Deadfront Primary Metering Cabinet 200A 15kV 3Ø 1-Line/1-Load 1
N0302 Double Ground Plate System 1
T1105 Elbow Term, 1/0 Al - 200A Load-Break with Sealing Kit 6
T1605 Insert, Loadbreak Bushing 200A 15kV 6
V0814 Vault & Pad, Concrete, Deadfront Padmounted Primary Metering Cabinet 1
Z0304 Clamp, Equip Ground Cu #6 Sol - 1/0 Str 3
Z0703 Connector, C-Crimp Cu #2 to #2 5

Notes:

  1. Important! - Contact Metering Department for cost estimates on material and labor for installing primary metering equipment in cabinet.
  2. Material list assumes the District is providing all of the materials for the job. Engineer must adjust list if customer will be providing some of the material.
  3. The material listed in this standard is for a 200A 15kV 3Ø cabinet configured for one 3Ø circuit feeding in (line) and one 3Ø circuit feeding out (load). It assumes use of 1/0 Al 175 mil TRXLP 15kV jacketed concentric neutral underground distribution cables.
  4. Primary cable termination side of cabinet is of dead-front construction, metering side is live-front.