12U323 Typical Dead-Front 200A 7.2 12.47kV 3Ø Underground Primary Metering Installation
Revision 4
Dec 23, 2016
| Compatible Unit | Description | Qty |
|---|---|---|
| D0110 | Deadfront Primary Metering Cabinet 200A 15kV 3Ø 1-Line/1-Load | 1 |
| N0302 | Double Ground Plate System | 1 |
| T1105 | Elbow Term, 1/0 Al - 200A Load-Break with Sealing Kit | 6 |
| T1605 | Insert, Loadbreak Bushing 200A 15kV | 6 |
| V0814 | Vault & Pad, Concrete, Deadfront Padmounted Primary Metering Cabinet | 1 |
| Z0304 | Clamp, Equip Ground Cu #6 Sol - 1/0 Str | 3 |
| Z0703 | Connector, C-Crimp Cu #2 to #2 | 5 |
Notes:
- Important! - Contact Metering Department for cost estimates on material and labor for installing primary metering equipment in cabinet.
- Material list assumes the District is providing all of the materials for the job. Engineer must adjust list if customer will be providing some of the material.
- The material listed in this standard is for a 200A 15kV 3Ø cabinet configured for one 3Ø circuit feeding in (line) and one 3Ø circuit feeding out (load). It assumes use of 1/0 Al 175 mil TRXLP 15kV jacketed concentric neutral underground distribution cables.
- Primary cable termination side of cabinet is of dead-front construction, metering side is live-front.