115H601 115kV H-Frame Double Circuit Tangent

Revision 1
Dec 26, 2023

Notes:

  1. Pole must be set so that pole tops are level, while maintaining minimum pole settings depths per District standards or as noted on the construction drawing. Refer to T&D Guideline 4-5-15.0.
  2. Engineer must specify the size & number of down guys and anchors depending on conductor design tension, line angle, available down guy lead and span length. Refer to T&D Guideline 4-6 and Compatible Unit Sections A and G.
  3. Outermost structure down guys must be splayed so as to provide a minimum of 3' clearance from the innermost structure. Refer to picture below.

 

Material List

Compatible Unit Description Quantity
I0706 Insulator, Horizontal Post 115kV Polymer 49" Nominal 2
I0707 Insulator, Horizontal Post 115kV Polymer 2
MS2302 Rock, Crushed 5/8” Minus, 5/8” and 3/4” 2 Cu Yd
R1007 Clamp, Line Post Insulator 795 - 1272 kcmil 6
R1501 Cross-Brace, H-Frame 115kV 1