115H308 115kV 2-Pole Switch Installation
Revision 8
Nov 24, 2015
Notes:
- Install a minimum of two 2/0 Cu ground leads from the switch handle to the ground mat system per N0105.
- The switch is not included in D0802 and must be special ordered.
- Line angles are not permitted on this structure.
- Pole Setting Depth: 10% of pole height + 2 ft.
| Compatible Unit | Description | Quantity |
|---|---|---|
| D0802 | 115kV 1200A Loadbreak Switch, 2-Pole Mounting | 1 |
| I0701 | Insulator, Polymer Suspension 115kV | 6 |
| MS2302 | Rock, Crushed 5/8" Minus, 5/8" and 3/4" | 3 Cu Yd |
| N0101 | Single Ground Rod Installation | 1 |
| N0105 | Mat System for Grounding Transmission Switch Controls | 1 |
| R0400 | Platform, 115kV Switch Mounting, Galv Steel | 1 |
| R107* | Clevis, Long Socket or Socket Eye | 6 |
| R1501 | Cross-Brace, H-Frame 115kV | 1 |
| T061* | Deadend, Comp Dbl Tongue | 6 |
| T070* | Terminal, Comp 15° | 12 |
| T0955 | Bolt, SS 1/2" x 2-1/2" | 24 |
| T0956 | Bolt, SS 1/2" x 3" | 24 |