115H308 115kV 2-Pole Switch Installation
Revision 8
Nov 24, 2015
- Install a minimum of two 2/0 Cu ground leads from the switch handle to the ground mat system per N0105.
- The switch is not included in D0802 and must be special ordered.
- Line angles are not permitted on this structure.
- Pole Setting Depth: 10% of pole height + 2 ft.
Compatible Unit | Description | Quantity |
---|---|---|
D0802 | 115kV 1200A Loadbreak Switch, 2-Pole Mounting | 1 |
I0701 | Insulator, Polymer Suspension 115kV | 6 |
MS2302 | Rock, Crushed 5/8" Minus, 5/8" and 3/4" | 3 Cu Yd |
N0101 | Single Ground Rod Installation | 1 |
N0105 | Mat System for Grounding Transmission Switch Controls | 1 |
R0400 | Platform, 115kV Switch Mounting, Galv Steel | 1 |
R107* | Clevis, Long Socket or Socket Eye | 6 |
R1501 | Cross-Brace, H-Frame 115kV | 1 |
T061* | Deadend, Comp Dbl Tongue | 6 |
T070* | Terminal, Comp 15° | 12 |
T0955 | Bolt, SS 1/2" x 2-1/2" | 24 |
T0956 | Bolt, SS 1/2" x 3" | 24 |