12U326 - Typical Dead-Front 600A 7.2/12.47kV 3Ø Underground Primary Metering Installation using 1100 kcmil Al 15kV EPR Jacketed Underground Power Cable

Revision 1
Apr 17, 2020

Compatible Unit Description Qty
D0112 Deadfront Primary Metering Cabinet 600A 15kV 3Ø 1-Line/1-Load 1
N0302 Double Ground Plate System 1
T1141 Elbow, Deadbreak Kit, 1/0-450 kcmil Al 600A 15kV Jckt Cable 6
V0816 Vault, 2-Piece Conc, 6'8"W x 12'8"L x 6'6"H 1
Z0304 Clamp, Equip Ground Cu #6 Sol - 1/0 Str 3
Z0703 Connector, C-Crimp Cu #2 to #2 5

Notes:

  1. Important! - Contact Metering Department for cost estimates on material and labor for installing primary metering equipment in cabinet.
  2. Material list assumes the District is providing all of the materials for the job. Engineer must adjust list if customer will be providing some of the material.
  3. The material listed in this standard is for a 600A 15kV 3Ø cabinet configured for one 3Ø circuit feeding in (line) and one 3Ø circuit feeding out (load). It assumes use of 1100 kcmil Al 15kV 175 mil EPR Jacketed Underground Power Cables.
  4. Primary cable termination side of cabinet is of dead-front construction, metering side is live-front.