12F606 - 3Ø Cluster Mounted Transformer Bank on Pole w/ 7.2/12.47kV Double Circuit on 13' Crossarm

Revision 6
Mar 25, 2020

Notes:

  1. Install connection from transformer tank round lugs to neutral. Connect neutral to ground wire.
  2. Do not remove tank grounding connection unless transformer cutouts are open.
  3. For transformer connections and fuse sizes refer to T&D Guideline 4-13 and 4-11-3.0 respectively.
  4. Two #2 adapter plates (R0304) per transformer are required for units 167.5kVA and larger.

Material List

Compatible Unit Description Quantity
E0202 Cutout, 100A 15 kV Polymer 3
N0110 Plate, Cu Ground 288 in² 1
R0101 Bracket, Cutout Pole Mount 1
R0102 Bracket, Cutout Crossarm Mount 2
R0303 3-Position Cluster Mount Bracket, Aluminum 1
Z010* Clamp, Hotline 3
Z060+ Connector, H-Type Al Compression 4